Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
29.8534, -97.82453
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Martindale 1 (869,685 sq ft) is under construction with completion slated for mid-2028. Martindale 2 is planned, and the campus is projected to exceed 2 million sq ft.

    Underlying source

Source notes

The investment figure ($2.8B) is the initial phase only. The county approved a tax abatement and reinvestment zone, but the amount is not stated. Coordinates are as listed by Baxtel. MW is undisclosed (an aggregator's 462 MW figure was not corroborated).

Initial 'clean-fuel' natural gas generation, meant to avoid grid-interconnection delays. Near the LCRA Timmerman peaker plant.