Edged Mesa Data Center
Edged US · Mesa, AZ · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.4152, -111.8315
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 36 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Facility opened; ribbon cutting held April 2, 2026.
Underlying source
Source notes
Operator-stated densities of 400+ kW per rack with liquid cooling and 120+ kW per rack with air cooling support an AI-capable classification, though no named AI tenant is disclosed. PUE, water-savings and density figures are the operator's own claims from its launch release and are not independently verified. Street address not published.
Sources and provenance
- Edged US Opens Waterless, AI-Ready Data Center in Arizona's Silicon Desert Tech Corridor · source retrieved 2026-08-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.