Energizer II Data Center (BPA L0702)
Savion (Shell Energy subsidiary), per BPA application documents · , WA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 45.7754842, -120.8009807
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Reported as a 1,000 MW BPA large-load request between Chamberlain Goodnoe Road and Goodnoe Hills Road; land owned by 101 Bar Ranches LLC; described as a data center, an AI center, or both, in due diligence.
Underlying source
Source notes
This is a queue position, not an award. Savion says preliminary feasibility work is underway.
BPA queue L0702, 1,000 MW, In Progress (Phase 1 scoping). Per application documents it would start at full capacity and need an external power source beyond Bonneville.
Sources and provenance
- Goldendale Sentinel: More data centers possible for county (Sep 2, 2026) · source retrieved 2026-10-30
- Spokesman-Review: Energizer II described as AI data center in application documents (Oct 7, 2026) · source retrieved 2026-10-12
- OpenStreetMap Nominatim geocode for Goldendale Goodnoe Hills Road (approximate) · source retrieved 2026-10-12
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.