Energy Vault Snyder AI Campus
Energy Vault, Inc. · Snyder, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.7138, -100.9112
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 500 MW
- Source record updated
- 2026-09-08
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Groundbreaking announced.
Source notes
Phased buildout: ~8 MW initial phase, ~25 MW phase two, with up to 500 MW long-term expansion planned. Uses Crusoe Spark modular data center units under a commercial agreement with Crusoe Cloud. Target commercial operation Q1 2027.
Sources and provenance
- Energy Vault breaks ground on AI Data Center Campus in Snyder, Texas · source retrieved 2026-09-08
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.