Equinix Culpeper Campus (CU1–CU4)
Equinix · Culpeper, VA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 18155 Technology Drive
- Coordinates
- 38.4551359, -77.9780171
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 62.5 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Baxtel lists the campus as built in 2009 (Terremark), later Verizon, and acquired by Equinix in May 2017.
Underlying source
Source notes
Four buildings, CU1–CU4 (Buildings A–D), with per-building operational MW of 11.25, 11.25, 15 and 25 (Baxtel), giving 62.5 MW total. Formerly the Verizon NAP of the Capital Region. The capacity figure is from an aggregator and not verified against Equinix IBX specs, because equinix.com could not be read as of October 2026. The OSM geocode of 18155 Technology Drive.
Sources and provenance
- Equinix Culpeper Campus · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.