SOURCE-LINKED U.S. REGISTRY

Equinix MI1 (NAP of the Americas)

Equinix · Miami, FL · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
50 NE 9th Street
Coordinates
25.782359, -80.1930886
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Acquired by Equinix from Verizon as part of a 29-data-center, $3.6B portfolio deal (closed May 1, 2017); originally built by Terremark as the "NAP of the Americas."

    Underlying source

Source notes

Formerly Terremark's "NAP of the Americas"; acquired by Equinix from Verizon in a 29-facility, $3.6B portfolio deal that closed May 1, 2017. Equinix's own technical spec sheet reports 296,775 sq ft of colocation space (255,512 sq ft in MI1-1&2, 41,263 sq ft in MI1-3) -- distinct from the widely-repeated but unsourced 750,000 sq ft gross-building figure. No single headline MW capacity is disclosed by the operator (spec sheet lists standby/UPS power per floor rather than a total IT-load figure); aggregators report conflicting, unconfirmed estimates in the 17-28 MW range. No AI/HPC-specific marketing found for this facility.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory