SOURCE-LINKED U.S. REGISTRY

ETC DC OpCo Lysite Data Center ("1 MW DC Site")

ETC DC OpCo LLC · Lysite, WY · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
43.285, -107.636
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    WDEQ Air Quality Division issued a proposed approval of the 2026-07-15 permit application; public comment open through 2026-09-14. Fremont County has no countywide zoning, so no county land-use permit is required.

    Underlying source

Source notes

Site is about three miles east-northeast of Lysite in unincorporated eastern Fremont County, near the Lost Cabin Gas Plant. The application documents label the project the "1 MW DC Site"; the DEQ analysis does not explain whether that designation is the anticipated electrical demand or another measure, so no capacity is recorded here. Footprint, acreage and water use are not disclosed in available records. Coordinates are a geocode from the published distance-and-bearing description and are not a parcel-confirmed point.

Permit application covers eight Mesa Power Solutions GV22 PowerCore natural-gas-fired emergency generator engines rated 604 horsepower each (4,832 hp total), each limited to 100 hours of non-emergency operation per year with non-resettable hour meters, which WDEQ treats as best available control technology.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory