Evocative BOS1 (Somerville)
Evocative · Somerville, MA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 50 Inner Belt Road
- Coordinates
- 42.377932, -71.080419
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 6 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-15
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Evocative's own Boston data center page states 46,000 sq ft with 21,600 sq ft of raised floor and 6 MW of total utility power.
Underlying source
Source notes
Formerly Internap/INAP Boston; acquired by Evocative. Marketed as "Boston" but sited in Somerville at 50 Inner Belt Road - a different building and operator from the tracked CoreSite BO1 at 70 Innerbelt Road. The 6 MW figure is total utility power stated by the operator, not IT load.
Sources and provenance
- Evocative Boston (BOS1) - "46,000 sq ft", "21,600 sq ft raised floor", "6 MW" · source retrieved 2026-09-15
- PeeringDB facility record: Evocative BOS1, 50 Inner Belt Road, Somerville · source retrieved 2026-09-15
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.