Expedient BWI1 (Owings Mills)
Expedient · Owings Mills, MD · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 11155 Red Run Boulevard
- Coordinates
- 39.4273178, -76.8115503
- Serving utility, source-reported
- BGE
- Operational capacity, source-reported
- 0.8 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Confirmed via official Expedient directory: 11155 Red Run Blvd, Suite 200, Owings Mills, MD 21117. 800kW critical IT load, 22,000 sq ft. Distinct from the Tidepoint facility in Baltimore city.
Sources and provenance
- Expedient official Baltimore data center page · source retrieved 2026-08-26
- OpenStreetMap node/11167641842 · source retrieved 2026-07-22
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.