4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)
4-3 Glenbrook Group · Salem Township, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 41.1078249, -76.1791155
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 3500 MW
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Salem Township Planning Commission recommended the zoning expansion; the Board of Supervisors decision was pending as of August 22, 2026.
Underlying source
Source notes
Referred to locally as 'Salem 3'. A 39-building campus (subject to change) assembled from more than 4,000 acres across roughly 194-200 landowners, with at least 80% of the assembled land intended to remain undeveloped green space. Stated potential power demand is roughly 3.5 to 4 gigawatts; the planned capacity records the lower bound of that published range. The group describes it as 'an energy and infrastructure development, not simply a data center development', with plans for an accompanying generation facility. Land-purchase figures are reported variously as a $1.2 billion deal and $1.4 billion in land purchases; because these are land prices rather than project investment, no investment figure is recorded. Coordinate is a township-centroid geocode shared with the separate QTS 'Salem 2' record.
Sources and provenance
- $1.2 billion land deal for second data center project in Salem Township announced by 4-3 Group · source retrieved 2026-09-21
- Developers tout impacts of 3 data center campuses; Zoning meeting set for Wednesday on 4-3 Glenbrook Group project · source retrieved 2026-09-12
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.