Luckett Road Data Centers (Fremont Peak Properties)

Fremont Peak Properties LLC (Beale Infrastructure) · Marana, AZ · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
32.495, -111.198
Serving utility, source-reported
Trico Electric Cooperative (north parcel); Tucson Electric Power (south parcel)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1500 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Marana Town Council voted 6-0 to rezone 661 acres along Luckett Road for the data center campus (Fremont Peak Properties/Beale Infrastructure), following applications submitted in October 2025 and packed public testimony on water, power, and growth concerns.

    Underlying source
  2. Proposed

    Opposition group Worker Power submitted referendum petitions challenging the rezoning; Marana officials rejected the referendum on the grounds that petitions lacked required legal property descriptions, ending the challenge.

    Underlying source

Source notes

Two parcels along Luckett Road: north parcel owned by the Church of Jesus Christ of Latter-day Saints (borders Pinal County); south parcel owned by the Kai Family Trust. Fremont Peak Properties LLC (also referenced as 'Humphrey's Peak Properties' in some coverage) is a subsidiary of Beale Infrastructure, backed by Blue Owl Capital; connected to, but a distinct site from, the separately-tracked 'Project Blue' Beale/Blue Owl effort in unincorporated Pima County near Tucson, and from Beale's separately-tracked Project Pilot in De Soto, KS. Developer projects ~400 permanent and ~4,200 temporary construction jobs (Chamber of Southern Arizona estimate) - not yet delivered, so no jobs figure is recorded. No explicit AI/GPU branding found in coverage; the AI classification is likely given Blue Owl Capital's profile as a major AI-datacenter-era infrastructure investor. Coordinates are approximate for the Luckett Road parcels.

Trico Electric Cooperative to provide 550-750MW to the north parcel; Tucson Electric Power to provide a 'matching amount' to the south parcel (combined range roughly 1,100-1,500MW). Per AZPM (January 2026), Beale representatives said this could mean up to 1,500 MW; that upper figure is recorded as the planned capacity.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.