GenH Morley Dam Data Services Facility
GenH · Morley, MI · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 43.490861, -85.443928
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
First public meeting at Deerfield Township Hall postponed on 2026-08-10 because of overflow attendance; later held at Morley Stanwood High School.
Underlying source
Source notes
Coordinates are a village-level geocode, not a parcel pin — the exact Frank Deyo Dam site footprint has not been published. No formal application had been filed as of the cited coverage.
Boston-based GenH proposes powering the facility with hydropower from the Frank Deyo Dam using a siphon-based 'adaptive hydro' approach that conveys water around the existing structure. No generation capacity has been published.
Sources and provenance
- Data center proposed for Morley dam; meeting postponed due to large number of attendees · source retrieved 2026-09-14
- How many AI data centers are planned in Michigan? We counted. · source retrieved 2026-09-14
- OpenStreetMap/Nominatim geocode for Morley, Mecosta County, Michigan (village-level pin) · source retrieved 2026-09-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.