Harmony Energy Park (Geronimo Power data center)

Geronimo Power · Mapleton, ND · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
46.8919, -97.0498
Serving utility, source-reported
Otter Tail Power Company
Operational capacity, source-reported
Not published
Planned capacity, source-reported
540 MW
Source record updated
2026-10-26

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Geronimo Power filed a conditional use permit application with Harmony Township for a data center near the Bison Substation north of Mapleton

    Underlying source

Source notes

Proposed powered data park in Section 15 of Harmony Township, about seven miles northeast of Casselton and north of Mapleton, near the Bison Substation (off 32nd St SE and 160th Ave SE). It would have two main buildings set at least a mile from any home on a ~640-acre footprint, about 80% of which is expected to stay green space. Construction would take two to four years. No end user is named. Coordinates are the Mapleton town point (approximate). Geronimo also holds a land option in neighboring Durbin Township; it is not recorded separately because no project there has been filed.

540 MW at peak demand. Geronimo says new generation would power the site: a 200 MW solar farm under construction next to the Bison Substation, a proposed 200 MW battery facility, wind and possibly natural gas. Otter Tail serves the area, and its large-load tariff is before the ND PSC. Minnkota says its planned ~400 MW gas plant in the same township is not meant to serve this data center.