GIGA Data Centers Mooresville Campus
GIGA Data Centers · Mooresville, NC · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 1035 Mecklenburg Highway
- Coordinates
- 35.5634941, -80.8280378
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 60 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-24
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Opened June 2019 on the site of a former racing facility; 165,800 sq ft. The investment figure is the stated $20M construction cost; the 21-acre land parcel was purchased separately for $9.5M. County: the source lists 'Mecklenburg' (evidently from the street name, Mecklenburg Highway), but the address geocodes to Iredell County, which is recorded here. Distinct site from the cancelled Tract Mooresville campus already tracked.
Sources and provenance
- GIGA Charlotte (Mooresville) — facility record (60 MW, 165,800 sq ft, opened June 2019, 21 acres, PUE 1.15) · source retrieved 2026-09-24
- OpenStreetMap Nominatim — 1035 Mecklenburg Highway, Mooresville, Iredell County, NC 28115 · source retrieved 2026-09-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.