SOURCE-LINKED U.S. REGISTRY

Goodnight Campus

Google / Crusoe · Claude, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
34.973, -101.367
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
933 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Armstrong County Commissioners Court approved tax abatement agreement with GN DC1, LLC (Crusoe Energy entity) at November 12, 2024 public hearing. Tenant not publicly named at that time.

    Underlying source
  2. Under construction

    Google confirmed partnership with Crusoe for Goodnight campus as part of $40B statewide Texas announcement, November 2025. Satellite imagery (Cleanview, Feb 24 2026) confirmed two buildings under active construction with roof installation and steel framing underway.

    Underlying source

Source notes

Campus name: Goodnight, near the town of Claude, TX (known address: 10001 Lima Rd, Claude, TX 79019). Coordinates approximate (county parcel area). Developed by Crusoe Energy via entity GN DC1, LLC (Delaware LLC, 255 Filmore St., Denver, CO 80206); Google is the hyperscale tenant/customer, confirmed publicly November 2025. Tax abatement agreement was signed with GN DC1, LLC in late 2024 without publicly naming the tenant. Google confirmed the Crusoe partnership but had not signed an offtake agreement for the on-site gas plant as of early 2026; negotiations on power amounts still ongoing per Google spokesperson. Planned IT capacity: Phase 1 described in tax abatement agreement as 'anticipated to consume up to 530 MW,' 4 buildings each with 4 x 25 MW data halls, on approximately 350 acres; Phase 2 (possible additional 3+ buildings) reported at up to ~500 MW additional; combined full build-out reported as 1 GW+ — all capacity figures are 'up to' ceilings from permit and abatement documents, not firm contracted amounts. Project was scaled back from an original 7-building plan (October 2025 local reporting); 4 buildings with construction permits from TDLR as of early 2026; Crusoe described 3-4 buildings as likely; grading on additional parcels suggests total program may reach 5+ buildings. First phase expected online 2026; initial county PILOT payment expected June/July 2026. The $40B Google Texas investment is a statewide commitment through 2027 covering multiple sites (Armstrong County, Haskell County, Ellis County) with no site-specific investment figure disclosed by Google. A $29B campus investment figure appeared in Aterio/Crusoe reporting — this is a projected ceiling, not a firm committed amount, so it is not recorded as an investment figure. Distinct from Google's separate Haskell County TX site and Red Oak (Ellis County) TX sites — do not conflate. Building 3 is scheduled for completion 2026-08-01; Building 4 is due March 2027. Nothing at the campus is yet described as operational.

Crusoe Energy filed TCEQ air construction permit (TCEQ announcement Feb 5, 2026) for a 933 MW natural gas power plant on-site at the Goodnight campus. Gas plant operates off-grid with no ERCOT grid connection for this generation asset. No carbon capture technology. Estimated emissions up to 4.5 million tons CO2/year and 1,600 tons criteria air pollutants/year per permit application. A portion of the campus also co-locates behind the meter with Goodnight Wind farm (265.5 MW, Serena Energy, came online 2024) under Texas SB6 net metering arrangement; proposal submitted to Public Utility Commission of Texas (PUCT), regulatory review ongoing as of mid-2026. Separate TCEQ wastewater permit WQ0016881001 filed under same entity, indicating water/utility infrastructure planning underway.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.