Google Eagle Mountain Site
Google · Eagle Mountain, UT · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.30935, -112.01198
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-15
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Every Eagle Mountain Community Reinvestment Area with a data-center purpose (Sweetwater #2, #3, #4, and Triple Tail) has a named beneficiary and none is Google — Sweetwater #2/#3 are QTS's, Sweetwater #4 is Meta's, and Triple Tail is Tract's — and a same-week rewrite of the SLTrib incentives story names only Meta and QTS as recipients of Eagle Mountain's data-center tax breaks, not Google. Google's October 2021 land purchase also predates by roughly 2.5 years the only geographically plausible project area (Triple Tail, whose drafting the Agency did not authorize until April 2024). Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.
Grist reports Google's Eagle Mountain project is 'delayed due to energy constraints' and that the company is waiting to build. No interconnection or generation detail was found in the sources read.
Sources and provenance
- Google buys land for potential data center in Eagle Mountain, promises to spend $1.2 billion · source retrieved 2026-08-14
- To power Utah's data center boom, companies are turning to fossil fuels · source retrieved 2026-08-14
- Eagle Mountain property tax hike triggers referendum — incentive recipients named (Meta, QTS) · source retrieved 2026-09-05
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.