Google Haskell County Data Center Campus

Google · Haskell, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.1576, -99.7337
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Ground broken; Google began engaging subcontractors for active construction

    Underlying source
  2. Proposed

    Google and Governor Abbott jointly announced a $40B Texas AI-infrastructure investment including two data center buildings at the Haskell County campus

    Underlying source

Source notes

Two data center buildings at one Haskell County site; treated as a single campus record. Announced Nov 14 2025 as part of Google's $40B Texas investment through 2027 (which also covers Armstrong County and a Wilbarger County/Vernon site); no Haskell-specific investment figure disclosed, so no investment figure is recorded (the $40B is a Texas-wide aggregate). Data-center IT capacity in MW not publicly disclosed. One building is co-located with the Quantum Clean Energy Project (Intersect Power, acquired by Google March 2026): 640 MW solar PV + 1.3 GWh battery storage, scheduled operational June 2026 - this is energy-project capacity, not data-center IT load. Job figures cited in press (1,200 construction / up to 11 permanent) come from the co-located Intersect energy project, not the data center, so they are noted here rather than recorded as job counts. Coordinates are the Haskell city centroid (no parcel-level GPS found).

Dedicated supply is the co-located Quantum Clean Energy Project (Intersect Power / Google subsidiary): 640 MW solar PV + 1.3 GWh BESS, operational target June 2026. Haskell County selected partly for wind and solar availability.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.