SOURCE-LINKED U.S. REGISTRY

Google Jackson County Campus

Google · Stevenson, AL · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
34.8842, -85.755
Serving utility, source-reported
North Alabama Electric Co-op
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Google announced a $600M data center at the former TVA Widows Creek coal-plant site in Jackson County

  2. Under construction

    Groundbreaking on the original $600M campus; 360-acre site off County Road 96

  3. Operational

    Original campus operational with two buildings (~135,000 sq ft each)

  4. Under construction

    $1.5B expansion announced; construction planned for 2026-2027; 1,000+ contract workers expected

Source notes

Campus operational since 2019 at the former TVA Widows Creek coal-plant site (~4.8 mi east of Stevenson). Recorded status is operational (the campus is built and running); a $1.5B expansion announced June 15 2026 is under construction for 2026-2027 (captured in the status history). Capacity is omitted: the widely cited 300 MW is Google's contracted new generation across the Tennessee Valley region, not a campus-specific figure. TVA partnership also includes a 2025 Kairos Power agreement for up to 50 MW of advanced nuclear for Google's AL/TN data centers (~2035). The construction workforce of 1,000+ is a projection for the expansion (Alabama Reporter: "More than 1,000 contract workers are expected to participate during various phases of the expansion.") and is recorded as 1,000 construction jobs. Baxtel labels this 'Google Bridgeport'; TVA, Wikipedia and the postal code (35772) place Widows Creek near Stevenson, so Stevenson is used. 360-acre site; coordinates from the Widows Creek plant.

Powered by TVA (federal utility). Google covers 100% of its power and infrastructure costs. Kairos Power advanced-nuclear partnership (up to 50 MW for the AL/TN region) expected ~2035.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory