SOURCE-LINKED U.S. REGISTRY

Google Montgomery County Data Center

Google · Clarksville, TN · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
1000 Boolean Drive
Coordinates
36.5288, -87.3636
Serving utility, source-reported
TVA
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Governor Haslam and TNECD announce Google to locate new data center in Clarksville, December 22, 2015

    Underlying source
  2. Under construction

    Google CEO Sundar Pichai breaks ground on former Hemlock Semiconductor site on Boolean Dr, February 2018

  3. Operational

    Google officially opens $600M Montgomery County data center; ribbon-cutting ceremony November 6, 2019

    Underlying source

Source notes

Address: 1000 Boolean Dr, Clarksville, TN 37040 (former Hemlock Semiconductor site). Coordinates are approximate for that site. Google reports $2.5B+ total Tennessee investment since 2018 but facility-level investment is $600M. 30% veteran workforce. Correction: Original announcement was December 2015 (not 2018); facility opened November 2019 (not 2022).

Power usage matched 100% with renewable energy through TVA deal

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory