Google Palo Data Center Campus
Google · Palo, IA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 42.0611, -91.7935
- Serving utility, source-reported
- NextEra Energy (Duane Arnold Energy Center)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Google approached the Linn County Board of Supervisors about a project of up to six buildings near the Duane Arnold Energy Center.
Underlying source
Source notes
Proposed campus of up to six buildings on land near the Duane Arnold Energy Center in unincorporated Linn County near Palo. Distinct site from Google's existing Cedar Rapids data center at the Big Cedar Industrial Center. No construction timeline set; Google shifted from county approval to annexation into the City of Palo in February 2026.
Google is helping recommission the Duane Arnold Energy Center with the intention that it power this campus; Iowa Public Radio reported the plant would supply over 90 percent of the data center's power, about 565 MW. That is a plant-supply figure, not a confirmed IT load for the campus.
Sources and provenance
- Google exploring data center project near Palo · source retrieved 2026-08-14
- Google eyes data center in Palo to bypass Linn County regulations · source retrieved 2026-08-14
- Linn County considers exception for Google as nearby Palo passes data center regulations · source retrieved 2026-08-14
- Data Centers in Unincorporated Linn County (EU-3 district and 18-month moratorium) · source retrieved 2026-08-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.