Google Project Mica
Google · Kansas City, MO · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.3097, -94.5845
- Serving utility, source-reported
- Evergy
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 700 MW
- Source record updated
- 2026-10-09
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Google acquires ~493 acres in KC Northland; site originally known as Rocky Branch Creek Technology Park (formerly a QTS/Diode Ventures plan)
- Permitted
City of Smithville and Port KC approve $10B campus; Google still unconfirmed publicly at this stage
Underlying source - Under construction
Google confirms Project Mica; construction already underway; first building expected within 18–24 months
Underlying source
Source notes
Five hyperscale data center buildings on 493 acres, northeast of I-435 and US-169 in KC Northland (near Smithville, Clay County). Google committed $1.5M to Smithville School District and $250K to Northland Career Center. Coordinates mark the I-435/US-169 interchange; Port KC places the ~500-acre campus at its northeast corner.
Google is Evergy's first customer under its Large Load Power Tariff (approved Nov 2025 by Missouri PSC and Kansas CC); up to ~700 MW to be supplied from Nashua substation and onsite substations at full campus buildout
Sources and provenance
- $10B, 500-acre Google campus gets stamp of approval near Smithville · source retrieved 2026-07-06
- Google announces construction underway for second data center campus in Kansas City · source retrieved 2026-07-06
- Google confirms new data center development in Kansas City's Northland · source retrieved 2026-08-24
- Google confirms Project Mica, a $10 billion data center campus in Kansas City · source retrieved 2026-10-09
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.