Google Redhawk Mesa Data Center Campus

Google · Mesa, AZ · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.3764, -111.6199
Serving utility, source-reported
Salt River Project (SRP)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
400 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Google filed plans as 'Stone Applications LLC' for 187 acres at NW corner of Elliot and Sossaman roads

  2. Under construction

    Phase 2 (280,000 sq ft, 185 acres) under construction targeting 2027; Phase 3 (283,500 sq ft) under Mesa Design Review Board review

    Underlying source
  3. Operational

    Phase 1 (288,530 sq ft data hall, Redhawk 1) went operational July 2025 for core cloud and AI services

    Underlying source

Source notes

Three-phase campus through 2030; originally filed anonymously as Project Red Hawk via LLC Stone Applications. Phase 1 operational July 2025. Phase 2 under construction. Coordinates at Elliot and Sossaman roads, SE Mesa. 2019 development agreement requires >=$600M capex by 2025, >=$1B by 2029, 750,000 sq ft built by 2030, and a >=$65,000 average full-time data-center salary; construction workforce has been cited around 1,200 (an estimate, not a permanent-jobs count). Status reflects Phase 1 (Redhawk 1), operational since July 2025; Phases 2 and 3 remain under construction, which is why Google's own US locations index still lists Mesa under sites in development.

400MW from in-state solar and wind farms committed for Phase 2 buildout

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.