Google Project Skyway (Pine Island)

Google · Pine Island, MN · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
44.2019, -92.6496
Serving utility, source-reported
Xcel Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Xcel Energy signed an agreement to power a new Google data center in Pine Island, MN; Electric Service Agreement pending MPUC approval

    Underlying source
  2. Permitted

    The City of Pine Island records that on 2026-01-20 it granted final approvals — rezoning, annexation, final plat, final development plan and conditional use permit — and on 2026-02-04 approved a ~$36.5 million tax abatement. The city states "The developer is now pursuing the required permits through various state agencies", and its own milestone list records no construction start, so the record moves from proposed to permitted rather than under construction.

    Underlying source

Source notes

Google's first Minnesota campus, Pine Island (Goodhue County), powered by Xcel Energy; ~250,000 sq ft initial building for AI applications. Electric Service Agreement pending MPUC approval as of Feb 2026 → proposed. The associated 1,900 MW (1,400 MW wind + 200 MW solar + 300 MW storage) is a new clean-energy build-out, not the data center's IT load — DC capacity not disclosed (omitted). Faces a local legal challenge. Coordinates are the Pine Island area centroid.

Xcel Energy; Google to cover new grid infrastructure costs. A separate 1,900 MW clean-energy build-out (wind/solar/storage) is tied to the ESA but is generation, not DC load.