SOURCE-LINKED U.S. REGISTRY

Google Project Spade Campus

Google · New Florence, MO · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
38.791, -91.508
Serving utility, source-reported
Ameren Missouri
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1200 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Google confirmed as Project Spade end user; administrative review completed

  2. Permitted

    Construction permits delivered

  3. Under construction

    Ground broken

Source notes

DISTINCT from AWS Project Green Campus: the two are on opposite sides of I-70 (Project Green north; Project Spade south, SE quadrant of the I-70/Hwy 19 interchange) - independently verified via DCD and Columbia Missourian. Site ~934 acres (~780 unincorporated + ~130 in New Florence). Developer: Related Digital. Campus targets 1.2 GW. A $15B figure was announced in May 2026, but its scope is not settled: Data Center Dynamics reports 'Google will invest $15 billion in building infrastructure in Missouri, including a data center in New Florence', while the Missouri Governor's May 2026 release describes 'a new $15 billion investment in building infrastructure in New Florence, Missouri'. Data Center Dynamics describes the campus itself only as a 'multi-billion-dollar' investment, so no investment figure is recorded. Amended from three buildings to two ~800,000 sq ft buildings; first operations targeted 2028. ~2,000 construction jobs and 'hundreds' of permanent jobs are projections (noted here, not recorded as job counts). Coordinates are an approximate site centroid (no verified parcel record).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.