Greensparc Wrangell Data Center (6-Mile Mill site)
Greensparc · Wrangell, AK · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 56.4708, -132.3767
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-18
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Wrangell planning and zoning commission voted 3-2 to recommend a 1-2 acre lease at the borough-owned former 6-Mile Mill site; the economic development board had voted 5-0
Underlying source - Cancelled
Wrangell Borough Assembly unanimously voted down the land lease
Underlying source
Source notes
Proposed 10,000 sq ft building, about 1-2 MW per the CEO, with battery backup and no diesel generators. Coordinates are Wrangell town, approximate; the actual site is the former 6-Mile Mill deepwater port site south of town.
Sources and provenance
- Data center lease recommended by Wrangell planning group (Wrangell Sentinel) · source retrieved 2026-10-18
- Wrangell Borough Assembly votes no on data center proposal · source retrieved 2026-10-18
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.