Kenwood Commons Technology Campus
Guild Ventures · Albany, NY · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 42.6225, -73.7601
- Serving utility, source-reported
- National Grid
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Proposed data center inside a mixed-use redevelopment of the 76-acre former Kenwood convent / Doane Stuart School property in Albany. No capacity is recorded: "Guild Ventures... filed an application with the New York Independent System Operator to use 180MW for the project," but the developer told CBS6 the 180 MW is "a theoretical ceiling for the entire mixed-use development" at full buildout and not the data center's expected use. Recording 180 as the facility's capacity would therefore be wrong. CBS6 reported in July 2026 that the developer has said the data center could use up to 100 MW; that is a ceiling, not a planned total, and at an August 2026 community meeting the developers said they did not yet know how many megawatts the data center would need (WAMC), so it is not recorded either. WAMC (August 2026) also reports the developers project a 250,000-square-foot data center with 125 to 175 full-time jobs and an online date of December 2028; these are developer projections and no size or job figure is recorded. The Rockefeller Institute's tracker separately describes it as "a 180 MW data center as part of a mixed-use development" - that reading conflicts with the developer's own clarification, which is why the record is marked reported. The developer describes the compute component as a "boutique, edge-scale colocation center" on "approximately 5 acres" of the 76-acre parcel serving hospitals, institutions, nanotech, government services and local employers - hence the mixed-use AI classification. The 76-acre figure is the whole redevelopment parcel, not the data center footprint. As of 2026-09-09, no permits had been submitted to the City of Albany per the reporting retrieved, and the May 2026 CBS6 article gives no investment figure and states no job counts, utility, or IDA/PILOT agreement. The connecting utility, National Grid, is stated in NYISO load queue #1754. Coordinates geocoded to the named Kenwood / Doane Stuart site in Albany, approximate.
NYISO load queue #1754 (EKG Group LLC, 'Kenwood Tech Center') lists National Grid as the connecting utility. The 180 MW request is a whole-site study ceiling for the mixed-use development; the developer says the data center itself could use up to 100 MW and would be on its own meter.
Sources and provenance
- Kenwood Commons owner asks for 180MW as part of property's pitch, now includes data center · source retrieved 2026-09-09
- Updates on the Cloud: More Moratoriums on Data Centers · source retrieved 2026-09-09
- Albany data center proposal faces new questions after Hochul's statewide moratorium (July 14, 2026) · source retrieved 2026-10-09
- Kenwood data center developers try to assuage community concerns (Aug 6, 2026) · source retrieved 2026-10-09
- NYISO Interconnection Queue, Load Projects: #1754 'Kenwood Tech Center', EKG Group LLC, 180 MW, POI Albany-Bethlehem 115 kV Line #18, utility National Grid, status 4 · source retrieved 2026-10-09
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.