Hog Lick Aggregates Data Center / Microgrid Proposal
Hog Lick Aggregates · White Hall, WV · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.4211977, -80.1825815
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-13
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Very early-stage: Hog Lick Aggregates, which owns a 277-acre site in White Hall, Marion County (adjacent to the I-79 High Tech Park), launched a feasibility study (reported 2026-05-05/06) into a microgrid-powered data center on the property, explicitly with 'no timeframe for development' and expected to take 'several years before yielding actionable results' per company president Brian Redmond. The site is pitched partly as potential support capacity for the NOAA supercomputing facility at the adjacent I-79 High Tech Park. No capacity, investment, or job figures were disclosed. Coordinates are a White Hall community-level pin, not a parcel-level location, since no street address was given.
Company describes a plan combining natural gas generation with geothermal cooling drawing on water from a shuttered nearby coal mine, plus potential carbon capture and storage integration -- all still at feasibility-study stage, not a committed energy source or technology.
Sources and provenance
- Local company proposes data center in Marion County · source retrieved 2026-09-13
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.