Holtec HI-CLOUD Indian Point data center campus (proposed)
Holtec International (Holtec Decommissioning International) · Buchanan, NY · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 450 Broadway
- Coordinates
- 41.2697, -73.9519
- Serving utility, source-reported
- Consolidated Edison
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 200 MW
- Source record updated
- 2026-10-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Holtec asked NYISO to study 200 MW of load for a potential data center at the Indian Point training-building property (disclosed at the Dec 5, 2024 Decommissioning Oversight Board meeting)
Underlying source - Proposed
Holtec announced HI-CLOUD, naming Indian Point as anchor site with an initial 200 MW target
Underlying source
Source notes
Concept-stage: Holtec has a NYISO load-study request and a corporate HI-CLOUD announcement but, per its site VP (Dec 2024), 'no offer' and no tenant. Holtec cites up to 2,000 MW of existing grid interconnection, Hudson River access for cooling, dark fiber, and potential future SMR-300 on-site generation. The site sits within Holtec's 240-acre Indian Point decommissioning property; the Village of Buchanan/Town of Cortlandt zoning question is unresolved.
Holtec cites existing grid systems capable of up to 2,000 MW and a future SMR-300 option; no generation is built.
Sources and provenance
- Holtec Announces HI-CLOUD: A Strategic Redevelopment Initiative (Indian Point anchor site, initial 200 MW target) · source retrieved 2026-09-21
- Holtec tells decommissioning board it wants to bring data center to Indian Point (200 MW NYISO request) · source retrieved 2026-09-21
- Holtec's Indian Point Proposal Draws Community Scrutiny (SMR-300 + 200 MW AI data center; opposition rally) · source retrieved 2026-09-21
- New York Data Center Map — 'Proposed Datacenters at 450 Broadway', Holtec Decommissioning International, Buchanan, 200 MW planned · source retrieved 2026-09-21
- Holtec has no imminent plans to restart Indian Point · source retrieved 2026-10-26