Homer City Energy Campus

Homer City Redevelopment · Homer City, PA · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
40.5383, -79.1542
Serving utility, source-reported
PJM (via FirstEnergy Pennsylvania Electric)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Ground broken; ~1,200 workers on-site as of 2026; first vertical steel beams raised; GE Vernova turbine deliveries beginning 2026; power targeted 2027

    Underlying source
  2. Proposed

    Announced as conversion of former Homer City coal plant (retired 2023); $10B project; 3,200 acres; $5M PA state grant; environmental permit challenged by groups

    Underlying source

Source notes

EPC contractor: Kiewit. The 4.5 GW figure describes the on-site power plant, not the data center's IT load, which, as of October 2026, the developers have not disclosed. Utility Dive (April 2025) reports, citing the developers, a "$10 billion" cost for the generating project.

Redevelopment of the former Homer City coal plant (Pennsylvania's largest, demolished 2023–25) into what developers call the largest US natural-gas plant powering an on-site AI data-center campus — seven GE Vernova 7HA.02 turbines; GE Vernova's release says the facility will generate "up to 4.5 GW" and the developer's project overview says "up to 4.4 gigawatts" (ceilings; no firm figure is recorded). EQT is to supply Marcellus gas; first power is targeted for 2027. PA DEP issued the air-quality plan approval on Nov 20, 2025. Developers describe the redevelopment site as spanning more than 3,200 acres.