HostDime Orlando Tier IV Data Center
HostDime · Eatonville, FL · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 1 Innovative Place
- Coordinates
- 28.6106, -81.3806
- Serving utility, source-reported
- Duke Energy
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-20
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
5-acre parcel (of the historic 99-acre Hungerford tract) fronting I-4 at Wymore Rd -- governing municipality is Eatonville, not Maitland. As of August 2026, HostDime's own marketing copy listed a mailing address of "1 Innovative Pl, Maitland, FL 32751" while an aggregator (baxtel) listed "1000 Wymore Rd, Eatonville, FL" for the same building, and both addresses were disputed/unverifiable via parcel search. The recorded street address, 1 Innovative Place, is the one HostDime's facility page and the PeeringDB registry give as of October 2026; it is not parcel-confirmed. 100,000 sq ft, 7-story building, 3 data-center floors, >1,000 racks. Groundbreaking May 2021; HostDime's own landing page and data-sheet page disagree on completion quarter (Q3 2026 vs Q2 2026) and the project has slipped repeatedly since an original ~2024 target; as of ClickOrlando's June 2026 report the facility was still not open. Investment is conflicting and stale: GrowthSpotter (Oct 2023) reported an original $35M budget grown to $58M actual (65.7% overrun); a separately-circulating $100M figure is single-sourced and unreconciled, so no investment figure is recorded. No capacity is disclosed. Distinct from HostDime's unrelated, already-operational 25,000 sq ft Tier III facility at 440 W Kennedy Blvd, Orlando. Eatonville Town Council (led by Councilwoman Wanda Randolph) has pushed a transparency measure over electricity/water use, noise, and appearance, and has assessed missed-deadline fines ($250-500/day); this intersects Florida SB 484 (effective July 1, 2026), which expands local authority over large-load customers and data-center water permits. As of 2026-09-10 the facility is still under construction. HostDime has requested multiple deadline extensions from the town of Eatonville (this is the third); September 2026 reporting says the facility could open as early as October 2026 pending final inspection.
Operator says the redundant power infrastructure is planned with Duke Energy.
Sources and provenance
- HostDime New Orlando Data Center · source retrieved 2026-10-20
- Orlando Tier IV Data Center data sheet · source retrieved 2026-08-02
- Data center along I-4 in Eatonville nears completion despite ballooning construction costs · source retrieved 2026-08-02
- Eatonville council weighs transparency push as data center raises resident concerns · source retrieved 2026-08-02
- Eatonville council turns up heat on HostDime data center over water, power fears · source retrieved 2026-08-02
- HostDime seeks deadline extension for data center in Eatonville, Orlando · source retrieved 2026-08-02
- PeeringDB facility registry — "HostDime Orlando Tier IV Data Center", 1 Innovative Place, Orlando FL · source retrieved 2026-09-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.