SOURCE-LINKED U.S. REGISTRY

Hut 8 River Bend AI Data Center Campus

Hut 8 · St. Francisville, LA · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
30.79, -91.38
Serving utility, source-reported
Entergy Louisiana
Operational capacity, source-reported
Not published
Planned capacity, source-reported
330 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Hut 8 selects West Feliciana Parish for River Bend AI campus. Fluidstack confirmed as anchor tenant (245 MW IT load).

    Underlying source
  2. Permitted

    West Feliciana Parish Council votes unanimously (6-0) to approve project on January 6, 2025.

    Underlying source
  3. Under construction

    Construction underway on Phase I (two 450,000 sq ft facilities). Anthropic signs long-term lease agreement. Jacobs (Dallas) serves as EPCM partner. Operations expected Q2 2027.

    Underlying source

Source notes

River Bend campus on 611 acres in West Feliciana Parish. Fluidstack (backed by Google) is primary tenant; Anthropic also signed a long-term lease. Phase I: two 450,000 sq ft facilities. Phase II (additional facilities) targeted by end of 2026. Coordinates approximate St. Francisville area.

330 MW from Entergy Louisiana for 245 MW of critical IT load. Proximity to River Bend Nuclear Generating Station (St. Francisville) enables accelerated grid interconnection timeline. Power mix includes nuclear baseload.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory