SOURCE-LINKED U.S. REGISTRY

Hyperscale Data Dowagiac Campus

Hyperscale Data, Inc. · Dowagiac, MI · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
415 East Prairie Ronde Street
Coordinates
41.984, -86.109
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
340 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Former manufacturing site at 415 East Prairie Ronde Street, Dowagiac; converting from Bitcoin-mining infrastructure toward AI/HPC colocation use, branded by the company as its 'Michigan AI Data Center.' The company's August 2026 strategic outlook presentation describes approximately 30 MW of power energized at the campus, a power figure rather than IT capacity, stated while Bitcoin mining was still running there. The first 20 MW of AI compute capacity under its customer agreement is targeted for operational status in Q4 2026 (TFTC, September 2026). The company is targeting 340 MW. A company release of September 2, 2026 says all Bitcoin miners were turned off effective September 1, 2026 as the site is prepared for AI data center operations, so the AI classification is confirmed rather than mixed-use. Recently completed a 48.5-acre acquisition, bringing the campus to ~83 acres total. Publicly traded company (Hyperscale Data, Inc.) sold ~100 BTC and opened a bitcoin-backed credit facility to fund construction, per its own reporting. Cass County passed a resolution urging more development transparency after resident noise complaints. Coordinates are an approximate Dowagiac city estimate, not parcel-geocoded.

Operator reports an agreement in principle with the local electric utility to increase available power to 300 MW, plus an agreement in principle with the local natural gas utility to supply an extra 40 MW. Neither utility is named in the release.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.