Project Hummingbird Data Center Campus (former Robena Mine)
International Electric Power · Greensboro, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.79, -79.92
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-25
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Greene County Planning Commission approved the first phase of site reclamation work in December; earthwork is underway at the former Robena Mine site. The compute campus itself has no land development approval yet and could go online as early as 2029.
Underlying source
Source notes
The compute campus at the 1,400-acre former Robena Mine site, distinct from the tracked Project Hummingbird power plant record. IEP has been in discussions with hyperscale customers; no tenant is named. Coordinates match the sibling power-plant record for the same site and are approximate.
Powered behind the meter by two on-site natural gas turbines generating a combined 910 MW, with an existing grid connection as backup.