Idaho National Laboratory Collaborative Computing Center (C3)
Idaho National Laboratory (U.S. Department of Energy) · Idaho Falls, ID · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 43.4666, -112.0341
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 4 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
High-performance computing data center on INL's Research and Education Campus (REC) in Idaho Falls -- distinct from INL's much larger remote desert 'Site' reservation (see the separate Aalo Atomics record). Houses DOE/INL supercomputers including Sawtooth, Hoodoo, and Bitterroot, supporting nuclear-energy modeling/simulation, materials science, and data science research; remote access is provided to Idaho university researchers via the Idaho Regional Optical Network. Built alongside the adjacent Cybercore Integration Center (80,979 sq ft) as part of a combined ~148,000 sq ft project; C3 itself is variously reported as 66,520 sq ft (general contractor JE Dunn) and 73,000 sq ft (engineering subconsultant AEI), and its power capacity is similarly inconsistent between sources -- JE Dunn describes an '8MW High Performance Computing (HPC) Data Center with 2MW of redundancy' and a 'Day 1 installation of 4MW capacity,' while AEI's page states '1.5 MW total power'. The operational capacity recorded is JE Dunn's Day 1 installation of 4MW; as of October 2026, neither cited source reconciles it with AEI's 1.5 MW figure. Completed circa 2022 per JE Dunn's project metadata. No exact street address was given in either source.
Sources and provenance
- Idaho National Laboratory C3 Data Centers · source retrieved 2026-09-21
- Idaho National Laboratory - The Collaborative Computing Center (C3) · source retrieved 2026-09-12
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.