SOURCE-LINKED U.S. REGISTRY

iPark 84 Data Center (745 East Drive, former IBM East Fishkill fab building)

iPark East Fishkill LLC (iPark 84; campus marketed by Lincoln Property Company and Saber-Hightower) · Hopewell Junction, NY · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
745 East Drive
Coordinates
41.5385513, -73.8210084
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
150 MW
Source record updated
2026-10-09

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    iPark East Fishkill LLC filed NYISO load interconnection request #1760 ('iPark 84 Data Center Interconnection', 150 MW, end-use DAT). The POI is a new 115 kV line from the CHG&E East Fishkill substation (Central Hudson). Status 5: SIS in progress.

    Underlying source

Source notes

The broker listing says the 270,000 sq ft former chip-fabrication building at 745 East Drive 'will be repurposed to a state-of-the-art data center'. It says the campus has 90 MW of gross utility power, 49 MW of it allocated to this building, which 'can be energized as early as Q3 2026' (the highlights say Q2 2027). It also cites a will-serve letter for an additional 150 MW from Central Hudson, says 'The ISO study for 150mW from Central Hudson is underway', lists Data Hall 1 at 9 MW, and calls the building 'Entitled for data center use'. The planned capacity of 150 MW is the NYISO request, unconverted. A Lincoln Property / Saber-Hightower / Waterfall joint venture acquired the iPark 84 portfolio (IREI, Aug 2026). Cleanview attributes development to National Resources, the prior owner, so ownership is in flux. The Town of East Fishkill passed a three-year data center moratorium on June 25, 2026; as of October 2026, the listing's 'entitled' claim had not been checked against it. As of October 2026, no tenant, investment or town application had been found. This is a different site from the Treetop East Fishkill proposal (Donovan Drive Holdings, NYISO #1738, 1 GW, warehouse site off I-84 / Lime Kiln Road): it has a different applicant, queue position and parcel. Coordinates come from the OSM address node.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory