Iron City No. 2 Data Center Project
Undisclosed applicant (Iron City No. 2 Data Center Project) · Beccaria Township, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.775104, -78.489923
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-15
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
DEP invited comment on a plan approval for 15 gas-fired generators (PA Bulletin Vol. 56, No. 29). Comments were due Aug. 17, 2026.
Underlying source
Source notes
Proposed permitted emissions (tons/yr): NOx 19.93, CO 29.46, VOC 20.43, PM10/PM2.5 3.03, CO2e 37,580. The applicant is not named in the notice; the name parallels the Iron City Wells site in Karthaus Township, but common ownership was not verified. The pin is the township centroid.
Air Quality Plan Approval application covers 15 natural gas-fired generators (no MW rating stated).
Sources and provenance
- DEP Invites Comments On Air Quality Permit For 15 Natural Gas Generators For Iron City No. 2 Data Center In Beccaria Twp., Clearfield County · source retrieved 2026-10-15