Iron Mountain MIA-1
Iron Mountain · Westview, FL · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 2925 NW 120th Terrace
- Coordinates
- 25.88416, -80.247556
- Serving utility, source-reported
- Florida Power & Light (FPL)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 16 MW
- Source record updated
- 2026-10-20
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
150,000 sq ft facility in Westview, Miami; opens 2026.
Underlying source
Source notes
150,000 sq ft. Classified a "telecom hub" rather than "data center" under Miami-Dade county code. Opens 2026.
Iron Mountain states 26 MVA of redundant operational power supporting 16 MW of customer IT load, and markets the facility as running on 100% clean energy. The generation source behind that claim is not identified. The operator describes diverse utility feeds and renewable energy matched to its operations, so the energy source is recorded as grid supply.
Sources and provenance
- Iron Mountain breaks ground on first data center in Miami · source retrieved 2026-07-17
- Westview fumes as quiet AI fortress rises in Miami backyard · source retrieved 2026-09-10
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Iron Mountain solution guide — MIA-1 Miami: "By mid 2026 this 150,000 ft2 AI-ready facility will phase up to support 16 MW of customer IT load based on 26 MVA of redundant operational power"; Tier III, 3.4-acre site · source retrieved 2026-09-14
- Iron Mountain Miami Data Center (MIA-1) · source retrieved 2026-10-20
- Iron Mountain breaks ground on its first data center in Miami · source retrieved 2026-10-20
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.