SOURCE-LINKED U.S. REGISTRY

Iron Mountain MIA-1

Iron Mountain · Westview, FL · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
2925 NW 120th Terrace
Coordinates
25.88416, -80.247556
Serving utility, source-reported
Florida Power & Light (FPL)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
16 MW
Source record updated
2026-10-20

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    150,000 sq ft facility in Westview, Miami; opens 2026.

    Underlying source

Source notes

150,000 sq ft. Classified a "telecom hub" rather than "data center" under Miami-Dade county code. Opens 2026.

Iron Mountain states 26 MVA of redundant operational power supporting 16 MW of customer IT load, and markets the facility as running on 100% clean energy. The generation source behind that claim is not identified. The operator describes diverse utility feeds and renewable energy matched to its operations, so the energy source is recorded as grid supply.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory