SOURCE-LINKED U.S. REGISTRY

IronGate Detroit "The Bunker" (28201 Van Dyke Ave, Warren)

IronGate Data Centers · Warren, MI · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
28201 Van Dyke Avenue
Coordinates
42.5000995, -83.0281942
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
45 MW
Source record updated
2026-10-24

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Baxtel lists the site as a planned facility with a planned year of 2027. Inflect lists it with 45,000 kW total power and markets colocation there.

    Underlying source

Source notes

Sources disagree on status. Baxtel says planned (2027). The More Than Just Parks tracker says operating but notes it has not been read back against a source. Recorded as proposed until a primary source confirms the facility is live. The 45 MW figure is listed utility power available on site, not built IT load. It is backed by a dedicated substation and marketed for liquid-cooled container deployments.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory