JDE Holdings Towner Data Center
JDE Holdings · Towner, ND · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 48.3458, -100.4057
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 5 MW
- Source record updated
- 2026-10-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Reported as under construction, unmanned
Underlying source
Source notes
Small (5 MW), unmanned facility about 40 miles east of Minot near Towner, reported under construction in October 2025. Its purpose was not disclosed; data_center is a placeholder type and could be crypto mining. Coordinates are the Towner town point. Current status after Oct. 2025 is unverified.
Sources and provenance
- Data centers are sprouting across North Dakota. How many are there and where will the next ones be planted? · source retrieved 2026-10-26
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.