SOURCE-LINKED U.S. REGISTRY

Karis Critical Deep River Campus

Karis Critical · Merrillville, IN · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.47, -87.27
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-01

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Reported as one of three early-stage Merrillville data center proposals.

    Underlying source

Source notes

Proposed campus on 180 acres on 101st Avenue east of Deep River County Park, at up to $900 million and reported to bring hundreds of jobs. Described as early-stage.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory