SOURCE-LINKED U.S. REGISTRY

KARIS DeKalb Campus (Peace and Gurler Roads)

Karis Acquisitions · DeKalb, IL · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.892979, -88.724193
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-25

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Permitted

    DeKalb City Council approved an amendment to Ordinance 2023-038 to accommodate a 1,750,000 sq ft data center in seven buildings at the NE corner of Peace and Gurler Roads; still carried on the city's project list as of 7/15/2026.

    Underlying source

Source notes

Seven-building, 1,750,000 sq ft campus. Coordinates are the Peace Road / Gurler Road intersection (OSM); the approval describes the NE corner, so the true footprint lies north-east of this point. No megawatt figure appears in the city record.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory