SOURCE-LINKED U.S. REGISTRY

Scrubgrass AI/HPC Data Center Campus

Keel Infrastructure Corp. (formerly Bitfarms) · Scrubgrass Township, PA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.2306, -79.8517
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-15

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Pre-development and power planning. Earliest additional power at scale 'around 2028'.

    Underlying source

Source notes

Planned HPC/AI redevelopment of the 650-acre Scrubgrass site, with up to about 1.3 GW of potential capacity (not secured). The existing waste-coal plant and bitcoin mining continue on site and, as of October 2026, are tracked separately as the Scrubgrass Generating Plant. Pin reuses that record's approximate point.

Has access to 63 MW (not under a formal utility agreement). Load studies with FirstEnergy totaling 750 MW. Pre-engineering for 550+ MW of behind-the-meter gas generation.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory