Klondike Wyalusing Data Center
KDI Wyalusing Power LLC (Klondike Digital Infrastructure / New Fortress Energy) · Wyalusing, PA · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- US Route 6
- Coordinates
- 41.6966, -76.244
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-25
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
PA DEP issued an air quality plan approval for the Wyalusing Energy Center — eight natural gas turbines totalling 248 MW nameplate — serving the hyperscale data center on the 335-acre Route 6 property; permit effective through 2027-04-08. Bradford County adopted data center SALDO standards on 2026-07-09.
Underlying source
Source notes
The exact position of the data center within the 335-acre parcel has not been disclosed, so coordinates are the Wyalusing Township point. The site previously held a 2019 air approval for an LNG processing plant that was never built and has expired. Permitted annual limits reported for the energy center: ~74 tons NOx, 93 tons CO, 92 tons PM, and just over 1.1 million tons CO2e — recorded here in notes rather than as emissions fields because the cited source is press coverage rather than the permit document itself.
The permitted Wyalusing Energy Center comprises eight 31 MW natural gas combustion turbines (248 MW nameplate) plus a diesel emergency fire pump, of which up to 218 MW is designated for data center operations.
Sources and provenance
- Bradford County adopts data center rules, Wyalusing hyperscale project's air permit issued · source retrieved 2026-09-25
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.