Kyndryl Boulder Data Center (former IBM Boulder campus)
Kyndryl · Boulder, CO · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 6300 Diagonal Hwy
- Coordinates
- 40.0890431, -105.1976845
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 6 MW
- Planned capacity, source-reported
- 15 MW
- Source record updated
- 2026-10-19
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Listed as operational with future phases planned.
Underlying source
Source notes
Enterprise data center carried over from IBM in the 2021 Kyndryl spin-off. About 115,000 sq ft building with about 70,000 sq ft of data center. Phase 1 is about 6 MW and the ultimate design is about 15 MW (third-party listing). Coordinates are for Building 1 on the shared campus.
Sources and provenance
- Kyndryl: Boulder · source retrieved 2026-10-19
- OSM Nominatim geocode: Building 1, 6300 Diagonal Highway · source retrieved 2026-10-19
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.