Lambda MidAmerica Industrial Park Data Center

Lambda · Chouteau, OK · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
36.1859, -95.343
Serving utility, source-reported
Grand River Dam Authority (GRDA)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-16

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Lambda announces plans to build a data center in the south section of MidAmerica Industrial Park; no construction start, completion date or total cost announced.

    Underlying source

Source notes

Lambda announced plans on 2026-09-27 for a data center in the south section of MidAmerica Industrial Park, Mayes County, within the Chouteau-Mazie Public School District tax boundary. Capacity, GPU count, acreage, street address, timeline and total cost are not stated in the sources. The park was selected through a 'reverse RFP' by MidAmerica Industrial Park; Grand River Dam Authority (GRDA) is the power provider and Lambda is to fund the upfront infrastructure needed to serve the project; Cloverleaf Infrastructure was selected by GRDA and MidAmerica to ready the site. Lambda says it will pay 100% of the facility's energy costs and plans to act as a flexible grid customer. Company-stated figures: up to 1,000 construction jobs, up to 100 permanent positions, about $500M in tax revenue over ten years at current rates. Separate from Google's existing Pryor campus, the Google Pryor Data Center Campus (Mayes County Expansion), also in Mayes County. Coordinates are the Chouteau city point (OSM Nominatim), not the site; the sources give no parcel or address.

Lambda states it will pay 100% of the facility's energy costs and fund upfront infrastructure to serve the project, and plans to be a flexible grid customer able to shift or reduce certain loads during peak demand.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.