Flatwoods Road Data Center (Lawrenceburg)
Undisclosed · Lawrenceburg, TN · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 35.2423023, -87.3347389
- Serving utility, source-reported
- Lawrenceburg Utilities System (LUS)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 4.9 MW
- Source record updated
- 2026-10-27
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
Lawrenceburg City Council approved the rezoning of the Flatwoods Road site from Large Lot Residential to Light Industrial, after a public hearing, second reading and a favourable Planning Commission recommendation. The facility is described as roughly 50,000 square feet.
Underlying source
Source notes
Developer/operator has not been publicly named in any source retrieved. Status is recorded as permitted on the strength of the completed rezoning; a site-plan review was scheduled for July 9, 2026 and its outcome was not found. Coordinates are the Lawrenceburg town point — no parcel location on Flatwoods Road has been published.
Sources and provenance
- Lawrenceburg data center — rezoning, size and community response (April 21, 2026) · source retrieved 2026-09-14
- Despite strong opposition, plans for a data center move forward in Lawrenceburg (NewsChannel 5): 4.9 MW network/edge facility; site plan passed planning commission unanimously; water figures from Lawrenceburg Utilities System · source retrieved 2026-10-27
- One Lawrence Co. city to vote on data center, another tries to ban facilities altogether (NewsChannel 5): planning commission to vote on permits for the 'Scalepoint TN data processing center' on Flatwoods Road · source retrieved 2026-10-27
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.