SOURCE-LINKED U.S. REGISTRY

LightEdge Altoona Data Center Campus

LightEdge Solutions · Altoona, IA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.6433, -93.4627
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-08-08

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Two-building purpose-built colocation campus on Northridge Circle, Altoona (Des Moines metro): 1435 Northridge Circle and 1401 Northridge Circle, both confirmed on LightEdge's own site. Owns/operates the buildings, not a tenancy. An MW or exact sq-ft figure could not be confirmed on any page read directly (the LightEdge page references 'critical IT capacity'/'total square feet' fields without rendering values, and a linked PDF spec sheet exceeded fetchable size). Third-party listings (not independently confirmed) cite ~73,000 SF total and N+1 cooling redundancy; no capacity is recorded rather than guessing.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory