Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 52 Locke Road
- Coordinates
- 43.2441282, -71.5460077
- Serving utility, source-reported
- Unitil
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 15 MW
- Source record updated
- 2026-10-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Northpoint Engineering filed a site-plan application for an 8,160 sq ft building: about 7,220 sq ft of micro data center, plus an office, a garage and a caretaker unit. The Planning Board's decision deadline is 2026-11-20.
Underlying source
Source notes
Northpoint Engineering, LLC is the applicant. Granite Municipal Manufacturing & Sales, LLC owns the land and is developing it; it bought the land in 2024. The parcel is nearly 21 acres, of which about 9.3 are buildable. About 54,780 sq ft of wooded buffer was cleared beforehand. No power capacity or investment figure has been published. The coordinates match the OSM address point for 52 Locke Road; the Census geocoder puts it about 600 m away. Precision is approximate.
Unitil would connect the center to the grid. The Planning Board asked Unitil or a third party for an independent grid-impact analysis. The applicant estimated about 13.5 MW for servers alone, excluding overhead, and diesel backup generators are planned.
Sources and provenance
- Concord plans: micro data center proposed at 52 Locke Road · source retrieved 2026-10-08
- 'Small dogs still bite': Proposed micro data center elicits resistance as development advances through application process · source retrieved 2026-10-08
- Locke Road Micro Data Center (tracker entry; coordinates 43.2441282, -71.5460077) · source retrieved 2026-10-08
- AI company behind micro data center plan in Concord says its design is 'the way of the future' · source retrieved 2026-10-26
- Concord Planning Board defers decision on 'micro' data center proposal · source retrieved 2026-10-26
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.