SOURCE-LINKED U.S. REGISTRY

Hamilton Innovation Center

Logistix Property Group · Hamilton, OH · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
1380 University Boulevard
Coordinates
39.3995, -84.5613
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Hamilton City Council approved sale of ~15 acres (University Commerce Park, Riverside neighborhood) to Logistix for $65,000; original plan ~155,000 sq ft data center + 95,000 sq ft substation, ~$15M investment, ~15 MW.

    Underlying source
  2. Proposed

    Project rescaled: Logistix partnered with Wharton Equity Partners and moved to a 29.2-acre city-owned parcel at 1380 University Boulevard, targeting 320,000 sq ft, 200+ MW (up from an earlier 80 MW plan), $1B+ investment, and 100+ jobs; groundbreaking targeted January 2026.

    Underlying source
  3. Proposed

    City-commissioned feasibility study found the grid can deliver only 45 MW within 24 months against Logistix's 240 MW request; Logistix asked the city to pause the study, stating no decision had been made on the project.

    Underlying source
  4. Proposed

    Butler County Commissioners' data-center moratorium coverage (moratorium covers only unincorporated townships, not the City of Hamilton) confirms the Hamilton project has been on pause since January 2026, with no resumption, cancellation, or construction start confirmed since.

    Underlying source

Source notes

Site scaled and moved twice: original Nov 2024 plan was ~15 acres/155,000 sq ft/~$15M/~15 MW at University Commerce Park; by fall 2025 it had grown to a 29.2-acre city-owned parcel at 1380 University Boulevard, 320,000 sq ft, 200+ MW, $1B+ (Wharton Equity Partners partnership). No single capacity figure is recorded — disclosed MW figures range from an original 15 MW up to a 240 MW request that a Jan 2026 city feasibility study found undeliverable (only 45 MW available within 24 months). Project has been paused since January 2026 pending resolution of that power-delivery gap; most recent confirmed reporting (June 2026) states it remains paused, with no resumption, cancellation, or construction start found as of August 2026. As of August 2026, no AI/HPC-specific marketing language was found in any source, so no AI classification is recorded. Coordinates are the Hamilton, OH city-area centroid, not an independently geocoded parcel point for 1380 University Boulevard.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory