Project Midway Data Center
LPI Group · Casa Grande, AZ · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.84, -111.79
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 400 MW
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Pinal County Board of Supervisors voted 5-0 to approve the comprehensive plan amendment changing 215 acres from Moderate Low Density Residential to Employment. Rezoning approval is still required before construction.
Underlying source
Source notes
Unincorporated Pinal County at the southwest corner of Selma Highway and Midway Road, roughly two miles south of the Casa Grande city limits but inside its planning area. The applicant projects about 225 permanent jobs at an average salary near $93,000 and $150 million in annual utility spend at full build-out. Reported acreage differs between sources (215 acres in the Pinal Post account, 294 acres in a same-day Pinal Central report); the 215-acre figure matches the comprehensive plan amendment as described. A Pinal Post report of 15 July 2026 says the current conceptual plan assigns approximately 400 megawatts across five buildings, about 80 megawatts each. The November 2025 economic impact study that projected a $6.6 billion capital investment and about 225 permanent jobs was based on a 225-megawatt facility, not the current plan of about 400 megawatts, and a separate supporting document in the application packet projects up to 405 people at full operating levels. As of October 2026, no investment figure or permanent job count is recorded, because the published figures are modeled projections for a 225-megawatt facility or an upper limit ("up to").
Sources and provenance
- Project Midway Data Center Approved by Pinal County Supervisors · source retrieved 2026-09-10
- Data Center Hearing: Project Midway Rezoning Set for July 16 · source retrieved 2026-09-10
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.